The Speed of Intergrated between Renovation & MOH Matters.

Faster No Matter What the Size

By utilizing EnviMedi Consultant's approach to modular buildings or premises, in many cases you can potentially cut the total construction or renovation time of your project by more than half. This translates into a significant time savings over site-built facilities. This means that your new facility could already be in operation while plans for a site-built building are still on the drawing board. Depending on the size of the project, Ramtech's modular construction approach can provide you with:
  • Standard projects in as little as 30 to 45 days
  • Custom projects up to 40% faster than site built

Realize the Opportunity Costs

Unlike typical site construction or renovation, with modular construction the site preparation and construction take place at the same time - eliminating many bottlenecks and site related delays. And with EnviMedi Consultant, you're working with a vertically integrated company, allowing us to control all of the manufacturing, construction, and finish-out scheduling ourselves. This faster construction timetable also provides you with improved opportunity costs. Your modular building is generating revenue sooner thereby reducing the interim fees, on-site project management costs, and associated security expenses. When you make the choice of getting our services from EnviMedi Consultant, your wait time just got a whole lot shorter.

No comments:

STEPS TO SET UP A CLINIC IN MALAYSIA

Malaysians nowadays are gradually shifting towards private healthcare system due to better facilities and care that are being offered comp...